The Union Cabinet, chaired by Prime Minister Narendra Modi on Wednesday approved the development of a second container terminal at Kamarajar Port Limited (KPL) in Tamil Nadu at an estimated cost of Rs 4,288.26 crore, under the Public Private Partnership (PPP) mode.
The Cabinet Committee on Economic Affairs (CCEA) cleared the project, which will be implemented on a Design, Build, Finance, Operate and Transfer (DBFOT) basis.
The proposed terminal will have a length of 900 metres, a design draft of 18 metres and an annual container-handling capacity of 2 million Twenty-foot Equivalent Units (TEUs). The project will be developed in two phases.
The first phase, with a capacity of 1.1 million TEUs, will involve an investment of Rs 2,429.32 crore, while the second phase, with a capacity of 0.9 million TEUs, will cost Rs 1,858.94 crore.
The investment in the PPP component will be arranged by the selected concessionaire. Kamarajar Port will separately incur an estimated expenditure of Rs 450 crore towards dredging.
The terminal will be designed to handle large container vessels of up to 24,346 TEUs and 400 metres in length, enabling the port to accommodate larger mainline ships and improve its connectivity with international shipping routes.
The project aims to cater to the growing demand for containerised export-import (EXIM) cargo from the Chennai-Ennore industrial and economic region and the wider southern hinterland. Major cargo-generating sectors include automobiles and auto components, engineering goods, electronics, chemicals and other manufactured products.
Kamarajar Port handled 49.08 million tonnes of cargo and 1,008 vessels during the 2025-26 financial year, including more than 7 lakh TEUs of container traffic.
Its existing container terminal has an installed capacity of 0.8 million TEUs annually and handled around 0.7 million TEUs during FY 2025-26, registering capacity utilisation of approximately 88 per cent.
Container traffic in India has grown at a compound annual growth rate (CAGR) of around 7 per cent over the past five years, while Kamarajar Port recorded growth of approximately 9.9 per cent during the same period. The feasibility study projects continued growth in container traffic across the south-eastern region, necessitating additional capacity.
The project will have a concession period of 40 years, including a construction period of 48 months. Phase I is scheduled to be completed within 24 months from the award of the concession, with commercial operations expected to begin in the 25th month.
Construction of Phase II will take place between the 25th and 48th months, with full commercial operations scheduled to commence in the 49th month.
The concessionaire will be selected through a transparent, open global bidding process and will recover its investment through user charges in accordance with the concession agreement and the applicable tariff framework.
The project is expected to strengthen Kamarajar Port’s position as a major container gateway on India’s eastern coast, improve maritime logistics efficiency and reduce dependence on foreign deep-water transshipment hubs and associated feedering costs.
It is also expected to provide an additional gateway for EXIM cargo from industrial clusters in Tamil Nadu and neighbouring regions, while supporting manufacturing and trade across Tamil Nadu, Karnataka, Andhra Pradesh, Telangana and the adjoining hinterland.
The project is aligned with the objectives of Maritime India Vision 2030 and Maritime Amrit Kaal Vision 2047. It is also expected to support the government’s Atmanirbhar Bharat initiative by enhancing domestic port capacity and improving logistics infrastructure.
According to the project proposal, around 750 people are expected to receive direct and indirect employment during the construction phase, while approximately 800 additional employment opportunities are likely to be generated during operations.
The government said the project would have no financial implication for the Centre, as the investment in the PPP component would be mobilised entirely by the selected concessionaire.
Kamarajar Port, formerly known as Ennore Port Limited, is one of India’s 12 major ports and is wholly owned by the Chennai Port Authority under the Ministry of Ports, Shipping and Waterways.
Located on the east coast of Tamil Nadu near the Chennai industrial and economic region, the port handles coal, petroleum, oil and lubricants, liquefied natural gas, liquefied petroleum gas, containers, automobiles and general cargo.
During FY 2025-26, the port recorded revenue of approximately Rs 1,280 crore and a profit before tax of Rs 924 crore. Its cargo traffic grew at a CAGR of 13.64 per cent over the past five years.
The Chennai-Ennore region is among India’s major industrial and manufacturing hubs. The expansion of trade and containerisation has increased the need for additional handling capacity and infrastructure capable of accommodating larger vessels to facilitate EXIM cargo movement from Tamil Nadu, southern Andhra Pradesh and the wider southern hinterland.
PIB




